2021.12.05 Severnside Hempsted

GVCV TASK 05 December 2021 – Severnside, Hempsted

GVCV TASK 05 December 2021 – Severnside, Hempsted.

The site we work at Hempsted is a Severn Water Sewage treatment installation with extensive lakes, pond, streams etc. We have carried out several tasks at this location and the current exercise is clearing the scrub and excess Willow growth around the main pond area. We have done this on previous occasions, we are gradually working our way around the perimeter of the pond.

The work in itself is not complicated – just a solid slog, cutting and clearing. The problem we have is disposing of the material we cut. Habitat piles are all very well but when they cover half of he site other measures need to be found of disposing of the brash.

A picture containing tree, outdoor, plant, forest

Description automatically generated

One of our many piles of small diameter brash.

A picture containing grass, tree, outdoor, hay

Description automatically generated

One of our many piles of larger diameter brash

We would normally dispose of the brash by burning but there is currently an issue with the tenant of the adjacent land which we believe will be resolved shortly allowing us to have a GRAND bonfire when we return to the site in January.

A group of people sitting in the woods

Description automatically generated with medium confidence

Solid work, in the bitter cold, Is pretty enervating and the volunteers (and the warden) are are pleased to sit down for their lunch break. The only problem is of course, getting up on cold stiff limbs to go back to work.A group of people sitting in the woods

Description automatically generated with medium confidence

A picture containing outdoor, white, pond, wire

Description automatically generated

Great to see that the local inhabitants appreciate our efforts on their behalf.

Leave a Reply

Your email address will not be published. Required fields are marked *